Week 94 on the Ground

I think that good weather is finally here for the summer.  Friday was a great day and here are the pictures to prove it.

The landscaping is going very well, and the work as even started at the Tabernacle.  The design will match the theme at the temple; a big semi-circular sidewalk in the front and maybe a fountain.  I believe it will be similar to the recent landscaping project that was completed at the Logan Tabernacle.


















 The open irrigation ditch has been replaced by concrete pipe.  I was also told that there will be steps over the top of the pipe for the sidewalk.  Handicap ramps will be on the far sides of the block - part of the semi-circular sidewalk.



 The open ditch will also be eventually replaced with pipe.  The workers were in a hurry to complete the first part of the pipe project so the water-master could turn the water on.



 Remnants of the capstones that were cut and placed on top of the rock walls.


 Mulch, mulch and more mulch placed around the trees