I hope by this time next year, the temple is completed and dedicated. The temple block is always a hive of activity and this Friday was no different.
The second story stained glass window on the west side has been installed. I bet it will look a whole lot more impressive from the inside.
The second story stained glass window on the west side has been installed. I bet it will look a whole lot more impressive from the inside.
More stone work on the parking structure. |
The copper roofing on the South side it 95% complete |
I think this will be the location of the cornerstone at the dedication |
The gold lettering is complete on the East side |
Taking a well deserved break |
The temple is now permanently wired to the electrical grid |
No comments:
Post a Comment